Grid Proto
Requirements, savings, and ship timing for small prototype builds on The Grid.
Grid Proto (formerly Value Proto) is a special Priority service for small prototype builds assembled on The Grid at our factory in Massachusetts, USA. When offered in your quote, it includes a 75% discount on board fabrication and assembly for a qualifying build. Parts are charged at their normal price, and shipping is not discounted.
What qualifies?
A build must meet every requirement in Designing for Grid Proto (design-file constraints, board settings, parts, and order quantity).
Using an approved supplier or a custom purchase source does not add a separate restriction. Unmatched parts, parts that cannot be purchased, and quantity shortfalls still need resolving for a valid quote, even when the build meets the manufacturing requirements above.
Reviewing your project
Use the requirements shown with the Grid Proto promotion to review what needs attention. Board requirement links open the relevant board settings; part requirement links filter the relevant lines in the Parts tab. A review link does not change your design or automatically mark parts DNP (Do Not Place).
If appropriate for your prototype, choose a quantity of ten or fewer, adjust the board specifications, replace unsupported parts, or change consigned parts to purchase sources. You can deliberately mark parts DNP when you want them left unassembled; check that the resulting prototype will meet your needs. See marking references as DNP.
Some requirements need a design change rather than a board setting change. Review the updated quote after making changes, including any remaining sourcing issues.
Why does my surface-mount connector prevent Grid Proto pricing?
Some connectors combine surface-mount connections with through-hole connections. These are hybrid parts, even if the component can be placed by a surface-mount process. Fitted hybrid parts do not qualify for Grid Proto.
If you need the part fitted, keep it marked for placement and choose an available quote that covers the complete build, or contact us before ordering. Do not mark it DNP to obtain Grid Proto pricing with the intention of asking us to fit it later. DNP means the part will be left unassembled; additional assembly is not included in that quote. Changing a part to consigned does not make the build eligible either, because Grid Proto does not support consigned parts.
Understanding the price
The 75% discount applies to board fabrication and assembly in the Grid Proto price. Parts and firmware programming are charged at their normal price, and shipping is not discounted. The savings shown compare the resulting price with Priority for the same build and quantity. Because parts are not discounted, the total saving is less than 75%. Priority also reflects current manufacturing capacity, so the difference varies; use the quote for the actual price and total savings.
A promotion may show what a qualifying build would cost at ten boards, with disqualifying parts omitted, or with compatible board settings. That comparison describes the build shown in the promotion, not necessarily your current project. Review its quantity and requirements before comparing it with your existing quote. Your project changes only when you make those edits yourself.
We show a promotion only when we can calculate an exact comparison. A board that needs geometry changes or has an unresolved CAM restriction may not have a Grid Proto promotion.
Assembly time and shipping
Grid Proto has a one-business-day assembly duration after boards and parts arrive. That is the assembly stage, not the total time from placing an order to delivery. Board fabrication, component sourcing, and shipping take additional time.
Use the specific ship date in your quote to plan your order. Grid Proto does not guarantee an earlier ship date than every other option, and a ship date is when the order leaves our factory, not when it arrives with you. See ship dates and service options.
Availability, price, and ship timing are determined by your current quote. A promotion explaining how to qualify is not itself an orderable offer.